Brouwersdam

The Brouwersdam is the largest Delta Works project after the Eastern Scheldt storm surge barrier.

The dam is located in the former sea arm, Brouwershavense Gat, between Goeree-Overflakkee and Schouwen-Duiveland. It protects against high water and strong waves from the sea. An access road also runs across the dam.

Origin

One of the main goals of the Delta Plan was to shorten the coastline, reducing the need to maintain (high) dikes. The Brouwersdam was one of the most effective ways to do this. It also served as a good practice for building the more complicated Oosterschelde barrier.

To protect Goeree-Overflakkee and Schouwen-Duiveland, the dam had to be built as far out to sea as possible. From the tip of Goeree-Overflakkee, the sandbank Kabbelaarsplaat was used, and from there, the crossing to Schouwen-Duiveland was made via the next sandbank, Middelplaat. This route was 20% to 30% cheaper than alternatives and was also the shortest for traffic between the Oosterschelde barrier and the Brouwersdam.

Consideration was also given to how the Brouwersdam would fit into the landscape. Halfway along the dam, space was created for beaches, a marina, and holiday bungalows (now known as Port Zélande). Today, the dam hosts the annual Concert at Sea, which attracts more than 40,000 visitors.

To close the northern gap, from Kabbelaarsplaat to Goeree-Overflakkee, twelve caissons were used, along with two ‘landhead caissons’. These hollow concrete structures, the size of apartment buildings, were first used during World War II. The Allies used them to create artificial quays at the Normandy invasion beaches. They were also used in the closing of dike gaps in Walcheren in 1945 and Ouwerkerk in 1953. The Watersnoodmuseum is housed in one of these caissons!

The caissons used in the Brouwersdam were specifically designed to be permeable, allowing water to pass through during placement to prevent being swept away by the current. Once all the caissons were positioned correctly, the openings were closed using gates during slack tide when the current was minimal. The caissons were then filled with sand and stone, effectively closing the northern gap of the Brouwersdam.

The southern gap, from Middelplaat to Schouwen, was too deep to be sealed with caissons. Instead, a cable car was set up with gondolas to drop concrete blocks weighing up to 2500 kg into the water. This method had previously been used on a smaller scale at the Grevelingendam. For the Brouwersdam, 240,000 blocks were needed to form the basic structure of the dam. The gaps between the blocks were filled with sand to prevent water from passing through. The dam was completed in 1971, and two years later, the roadway was opened.

To restore the ecosystem, Rijkswaterstaat constructed the Brouwerssluis in 1978. The sluice consists of two concrete tubes, each 195 meters long, and a fish pass of equal length. This allows seawater to flow freely into and out of the Grevelingenmeer, which has become the largest saltwater lake in Western Europe, covering 11,000 hectares.

Plants and animals are gradually returning to the area. Flounders can now swim freely from the Grevelingenmeer to the North Sea, and the oyster, once thought to be extinct, has returned. However, the deeper layers of the lake lack sufficient oxygen for underwater life. To address this, plans are in place to create openings in the dam, allowing limited tidal flow to help refresh the water.

In other parts of the Grevelingenmeer, nature has changed due to the limited tidal flow, which has dried out the land. Oystercatchers have disappeared from the area, replaced by avocets, plovers, lapwings, and little terns. Today, the Hompelvoet island in the Grevelingenmeer has become one of the largest breeding grounds for the common tern in the Delta region, with 3,000 breeding pairs.

Address

Weg van de Buitenlandse Pers 5, Ouwerkerk

Opening hours

Open daily from 10:00 to 17:00. Between November 1 and March 31, the museum and bistro Vijfde Caisson are closed on Mondays.
On 23 and 30 December: open // On December 25 and January 1: closed